d73ff9b0fb
Deploy Site / deploy-vercel (push) Has been cancelled
Deploy Site / deploy-docs (push) Has been cancelled
Docker / shell lint / Lint Dockerfile (hadolint) (push) Has been cancelled
Docker / shell lint / Lint docker/ shell scripts (shellcheck) (push) Has been cancelled
Docker Build and Publish / build-amd64 (push) Has been cancelled
Docker Build and Publish / build-arm64 (push) Has been cancelled
Lint (ruff + ty) / ruff + ty diff (push) Has been cancelled
Lint (ruff + ty) / ruff enforcement (blocking) (push) Has been cancelled
Lint (ruff + ty) / Windows footguns (blocking) (push) Has been cancelled
Nix Lockfile Fix / auto-fix-main (push) Has been cancelled
Nix Lockfile Fix / fix (push) Has been cancelled
Nix / nix (macos-latest) (push) Has been cancelled
Nix / nix (ubuntu-latest) (push) Has been cancelled
OSV-Scanner / Scan lockfiles (push) Has been cancelled
Build Skills Index / build-index (push) Has been cancelled
Tests / test (1) (push) Has been cancelled
Tests / test (2) (push) Has been cancelled
Tests / test (3) (push) Has been cancelled
Tests / test (4) (push) Has been cancelled
Tests / test (5) (push) Has been cancelled
Tests / test (6) (push) Has been cancelled
Tests / e2e (push) Has been cancelled
uv.lock check / uv lock --check (push) Has been cancelled
Docker Build and Publish / merge (push) Has been cancelled
Build Skills Index / trigger-deploy (push) Has been cancelled
Tests / save-durations (push) Has been cancelled
821 B
821 B
funnel
Narrowing stages showing conversion, filtering, or refinement process.
Structure
- Wide top (input/start)
- Narrow bottom (output/result)
- Horizontal layers for stages
- Progressive narrowing
- 3-6 stages typically
Best For
- Sales/marketing funnels
- Conversion processes
- Filtering/selection
- Recruitment pipelines
- Decision processes
Visual Elements
- Funnel shape clearly defined
- Distinct colors per stage
- Width indicates volume/quantity
- Stage icons or symbols
- Numbers/percentages per stage
Text Placement
- Title at top
- Stage names inside or beside
- Metrics/numbers per stage
- Input label at top
- Output label at bottom
Recommended Pairings
corporate-memphis: Marketing funnelsisometric-3d: Technical pipelinescartoon-hand-drawn: Educational funnels